Fort Polk, LA
General Contractor
Transition Team Mission
Constructed new physical fitness facilities for soldiers returning
from deployment. Added additional lightning grounding protection for
the ammunition storage area.
Fort Polk, LA
General Contractor
Veterans Hospital
General Contractor
Demo and excavate existing parking lot and roadway
and built headwall. Installed handicap ramps and sliding
doors for front entrance.
Street Maintenance / Construction
General Contractor
Demo and excavate existing roadway and
drainage structures. Survey and grade to designed elevation.
Replace road along with all RCP and catch basins.
- Easy Street
- Kennedy Street
- Myrtle Street
- Bellemead Street
- East 84th Street
- Roitan Street
- Berlingane Road
- Colquitt Road
|
- Norma Street
- Quinlen Street
- Albert Street
- Highway 159
- Highway 2
- Ironwood Street
- Keithville Lodge
- Line Ave turn out
|
- Courtesy Lane
- Glen Cove
- Hardy Street
- Havanna Street
- Lyba Street
- McAlpine Street
- 12 Mile Bayou
- Wyngate Street
|